正反循環鑽機資料
6寸正反循環一體鑽機,采用變速電機,鑽速有4個速度。正循環用高速,反循環用低速。
一、正、反循環鑽機的用途及技術性能
1.ZFJ-1500型(xing)正(zheng)反(fan)循(xun)環(huan)鑽(zuan)機(ji),是(shi)綜(zong)合(he)了(le)多(duo)個(ge)功(gong)能(neng)為(wei)一(yi)體(ti)的(de)回(hui)旋(xuan)鑽(zuan)機(ji),它(ta)體(ti)現(xian)了(le)一(yi)機(ji)多(duo)用(yong)途(tu)的(de)新(xin)技(ji)術(shu)。是(shi)理(li)想(xiang)的(de)成(cheng)孔(kong)機(ji)械(xie),行(xing)走(zou)方(fang)式(shi)有(you)液(ye)壓(ya)步(bu)履(lv)式(shi),車(che)載(zai)式(shi),履(lv)帶(dai)式(shi),拖(tuo)車(che)式(shi)多(duo)種(zhong)機(ji)型(xing),使(shi)該(gai)機(ji)的(de)使(shi)用(yong)性(xing)更(geng)強(qiang),操(cao)作(zuo)更(geng)靈(ling)活(huo),方(fang)便(bian)可(ke)靠(kao)。該(gai)機(ji)在(zai)地(di)層(ceng)的(de)多(duo)變(bian)性(xing)上(shang),可(ke)隨(sui)時(shi)根(gen)據(ju)地(di)層(ceng)快(kuai)速(su)改(gai)變(bian)鑽(zuan)孔(kong)工(gong)法(fa)(正反循環)。另ling外wai本ben機ji可ke變bian換huan四si種zhong鑽zuan速su,很hen好hao的de解jie決jue了le鑽zuan速su要yao求qiu。因yin此ci該gai機ji更geng適shi合he流liu沙sha,淤yu泥ni,粘zhan土tu,石shi卵luan石shi,砂sha礫li層ceng,風feng化hua岩yan等deng多duo種zhong複fu雜za地di層ceng的de施shi工gong。被bei廣guang泛fan應ying用yong在zai建jian築zhu,橋qiao梁liang,水shui利li,水shui井jing,電dian力li,電dian訊xun,工gong程cheng降jiang水shui等deng工gong程cheng施shi工gong中zhong。
One、The use and technical performance of a positive and reverse circulation drilling rig
1.ZFJ-1500 type reverse circulation drilling machine,Is integrated with multiple functions as one of the rotarydrillingrig,It embodies the new technology of a machine.Is an ideal pore forming machine,Walking method has hydraulic walking type,Vehiclemounted,crawler type, Trailer type,Make the machine more use,The operation is more flexible, convenient and reliable.This machine is in the variable of formation.May at any time according to theformationchange fast drilling method。In addition, The machine has four speeds。Therefore, this machine is more suitable for sand, silt, clay, stone pebbles, gravel, and other weathered rock complexstratumconstruction.Is widely used in construction, bridges, water conservancy, water wells, electricity,telecommunications, engineering and other construction projects.
二、鑽機的構造
ZFJ-1500型鑽機是正反循環鑽機,由YD多級變速電機,減速機,正、反循環泥漿泵、閥門、液壓油泵、油缸、主卷揚、副卷揚、配電箱、鑽架、鑽杆、鑽頭組成。
1.電動機.主動力電機為YD多級變速電機,其餘為Y係列普通電機。
2.減速機為四軸三級正齒輪減速,可用齒輪變換變速,分四種轉速。
Two, the structure of drilling rig
ZFJ-1500 type drilling machine is a positive and negative circulation drilling machine,By YD multi speed motor, reducer,positive,reverse circulation mud pumps, va*es, hydraulic pump, cylinder, main hoist, vice winch, distribution box, drill frame, drill pipe, drill bit.
1 、Drive motor is YD series of multi speed variable speed motor
2、 reducer for the four shaft three gear reduction, can be used to transform the gearspeed,divided into four kinds of speed.
三、工作原理
1.鑽機的油壓係統均由油泵將壓力油泵通過管道經多路閥控製,根據需要在送達各執行機構,使它完成各項動作。
2.減速機將動力經變速傳至輸出軸,帶動鑽杆和鑽頭進行回旋運動,完成正轉(順時針方向)進行切削工作,(反轉做卸鑽杆時用)正常鑽孔中禁止反轉。(反轉會引起掉鑽杆,鑽頭事故)
3.正、反循環的操作:
3.1在施工中如遇到地層或洗井原因需要更換鑽孔工法時,其操作步驟是,以正循環為例,操作液壓手柄,關閉大泥漿泵上的壓閥,啟動3PNL小泥漿泵,水經管道經大泵、鑽杆、進入鑽尖底部,使孔中的切削泥渣被水流托起順井管流到沉澱池。經沉澱水又進入3PNL泥漿泵,形成循環。
反循環工法,主機旋轉,關閉大泵閥門,啟動3PNL漿泵,給大漿泵灌泵,使空氣排空,啟動大漿泵同時開啟閥門,關閉3PNL漿泵,大泵出水正常就可正常工作。(如果鑽杆中的空氣未排空,或有地方漏氣,將影響大泵出水)。正反循環可隨時互換。同時反循環可做正循環鑽孔完成清孔(清除沉澱)工作。
3.2鑽機的下籠及灌灰
zhuangkongwanchenghou,tichuzuangan,zuantou,zuanjitongshixianghouyidongheshideweizhi,shijijiashangfuetoudiaogouduizhunzhuangkongzhongxinweizhun,tongshijuanyangjiukexialongheguanzhushangpinhui。
Three, working principle
1 the hydraulic system of the drilling machine is controlled by the multi way va*e of the pressure pump through the pipeline, and it is required to be served on the executive body, so that itcancomplete the action.
2.The reducer will power transmission is transmitted to the output shaft, drive drill and cyclotron motion, complete forward (clockwise) carry on the work of cutting and (reversal unloading thedrillpipe) in normal drilling ban reversal (reversal will cause the drop of drill pipe, drill bit accident)
3.positive and reverse circulation operation:
3.1 in construction such as encountered strata or clear hole and need replacing the positive and reverse circulation, take the positive cycle, for example, hydraulic operation handle large mudpumppressure va*e closed, start small 3pnl mud pump, mud through a pipeline, after pump, drill pipe, into the bottom of the bit, mud by water hold up along the pipeline flow into the mud pool.Afterprecipitation of water into the 3PNL mud pump, the formation of circulation.
四、鑽機的安全操作規程
1.本機操作人員,必須經過培訓,應熟練掌握操作機構和熟悉安全操作規程方能上機操作。嚴禁酒後上機操作。
2.kaijiqian,yingduizuanjijipeitaoshebeijinxingjianzha,tebieyingzhuyijianzhagejuanyangjideshacheshifoulinghuokekao,gangsishengshifouyouduansiduanguxianxiang,daiquerenwanhaohou,fangkekaijigongzuo。
3.現場工作人員,必須穿絕緣鞋和配戴安全帽。
4.拆裝鑽杆時應集中精力,及時清除鑽杆螺紋上麵的異物,並加少許機油,可減少鑽杆的損壞和漏氣的發生。
5.操作人員應堅持交接製度,交班時應向接班者交代清楚鑽機的工作情況和隱患,如有異常應處理後方可工作。
Four, drilling rig safety operating procedures
1 this machine operator must be trained, should be familiar with the operating mechanism and familiar with the safe operating procedures to operate on the machine.
2、before starting the machine, should drilling rig and ancillary equipment were examined in particular should pay attentiontocheck the windlass brake is flexible and reliable, whether the rope is broken wire breaking phenomenon, to be confirmed that the intact, start working.
3、field staff must wear insulated shoes, wear safety helmet.
4、When removing the drill pipe energy should be concentrated, pay attention to remove the foreign matter on the drill pipethread,drill pipe joints a little oil, can reduce the occurrence of drill pipe damage and leakage.
五、鑽機的使用與保養
1.經常檢查主機的卷揚油位,發現缺油應及時添加,定期更換主機機油,向卷揚機,泵內注油。
2.接場地電源時要注意相差,大泵不可反轉。
3.工作中,應隨時監視電器儀表,傾聽各各運轉部件響聲,如突發異常聲音,應停機檢查,不可讓設備帶病作業,緊固件不可鬆動。
4.液壓手柄操作時,應先慢後快(視場地情況定)如操作過快會損壞設備和發生危險
5.鑽進速度根據地層變化而變化,視反循環泵的出水狀況(出水流量大,可快進,水量小要慢進或停進)。同時要控製泥漿比重,在額定電流範圍內,慢慢鑽進。
6.經常檢查油管及接頭是否漏油,油箱缺油,如缺油油缸有爬行現象。
7.鑽機長時間停用,應將所有油缸收回,或用防鏽油包好,防止生鏽和損壞。
8.鑽機累計進尺達五千米時,應進行保養維修。
Five, the use and maintenance of drilling rig
1.found that the lack of oil should be added in time, regular replacement of oil to the host, hoist, pump oil.
2 .In the construction site, check the pump can not be reversed。
3 .work, should be at any time to monitor the instrument, to listen to the operation of the various parts of the sound, such as sudden abnormal sound, should beshutdown inspection, whether the loosening of screws.
4. hydraulic handle operation, should first slow fast (depending on the location of the site). If the operation is too fast will damage the equipment and theriskof
5. The drilling speed according to the stratigraphic changes varies, depending on the pump reverse circulation of water (water flow, high, fast forward, asmallamount of water to slow or stop). At the same time to control the proportion of mud, in the current range of rated current, and slowly drilling.
6 .often check whether the oil pipe and the joint oil leakage, the fuel tank is short of oil, such as the lack of oil cylinder crawling phenomenon.
7 drill rig, long time not to use, should be all the supporting legs of the oil cylinder to recover, or with anti rust oil package, prevent rust and damage.
8 drilling depth of five thousand meters, should carry out maintenance and repair.
六、配電係統
1.配電箱是ZFJ-1500鑽機的配套設備,它適用於額定電壓380V,頻率80HZ,三相交流供電電網。
2.使用條件
A.空氣溫度不大於85%
B.海拔高度不超過1000米
C.網絡電壓波動不大於-5%--+5%
3.箱體采用戶外式結構,進出線均設在箱體底部。
場地電源接好後,合上漏保開關,控製按鈕即可正常工作(確認電機旋轉方向後)。
Six, power distribution system
1. The distribution box is supporting equipment zfj-1500 rig for to the rated voltage 380V, frequency 80Hz, three-phase AC power supply.
2. Using conditions
A.air temperature not greater than 85%
B.sea level height of not more than 1000 meters
C. network voltage fluctuation is less than -5% of the +5%.
D.After the site power is connected, close the leakage protection switch, the control button can work normally (confirm the motor rotation direction).